Resource guide

AI Data Centers in Nebraska: Every Facility Tracked (2026)

Google operates or has proposed four AI data center facilities across Nebraska totaling at least 2,850 megawatts of known capacity, including a planned 2,700-megawatt Lincoln campus that requires its own gas plant.

Last updated September 15, 2026 1437-word guide Editor Ban the Bots

Nebraska hosts four major artificial intelligence (AI) data center facilities tracked on this site, all developed and operated by Google. Ban the Bots' data center map tracks these four facilities across Douglas, Lancaster, and Sarpy counties as of 2026. Together, they represent at least 2,850 megawatts of disclosed electrical capacity across two sites, while two operating campuses do not publicly disclose their capacity ratings. That known total already exceeds the combined tracked capacity of neighboring Iowa (600 megawatts).

Which AI Companies Are Building Data Centers in Nebraska?

Google is the sole company operating or proposing major AI data centers tracked on this site in Nebraska. Unlike states where multiple cloud hyperscalers compete for utility connections and land, Nebraska's tracked footprint is entirely a Google buildout. The company has established facilities in Omaha, Papillion, and Lincoln, expanding its presence steadily since initial announcements in 2022. No facilities operated by Microsoft, Meta, or Amazon Web Services appear in this site's tracking data for Nebraska.

This single-operator concentration gives Google an unusually large physical and electrical footprint in the state. The company's projects range from operating enterprise centers to a proposed mega-campus that would rank among the single largest power consumers in the entire Midwest. Across all four sites, Google serves as the developer, tenant, and primary corporate backer behind the utility infrastructure requests.

Why Google Is Building Across Eastern Nebraska

Google's concentration of facilities in eastern Nebraska reflects specific infrastructure decisions and state-level incentives documented in public records:

Power Demands, Dedicated Gas Generation, and Water Sources

The defining environmental and community issue in Nebraska's AI buildout is the sheer scale of electrical demand required by Google's newest proposed facility. On March 1, 2026, details emerged for the Google Nebraska Mega-Campus, also designated as Lincoln Phase 2. The planned campus carries a design capacity of 2,700 megawatts. To put that number in context, this single facility would consume more electricity than the entire city of Lincoln requires during its peak summer cooling hours.

Because the local utility grid cannot support a 2,700-megawatt load without destabilizing regional supply, the project relies on a privately built, utility-scale natural gas power plant. Google has partnered with Tenaska and Tallgrass Energy to develop this power plant, which could become the largest natural gas generation facility in Nebraska. If approved and constructed, the mega-campus could begin operating as early as 2029, introducing a major new source of fossil-fuel generation into Lancaster County specifically to support AI compute workloads.

Water consumption also presents distinct operational requirements across the state's facilities:

For community members evaluating cooling volumes and resource allocation, Ban the Bots tracks water metrics nationwide through the interactive AI water use calculator and provides regional context in the AI data center impact explainer.

Nebraska AI Data Center Facilities, One by One

Every facility tracked by Ban the Bots in Nebraska is detailed below with verified location, status, power capacity, and utility sourcing:

FAQ: AI Data Centers in Nebraska

How many AI data centers are in Nebraska?

Ban the Bots tracks four major AI data center facilities in Nebraska as of 2026, all owned or developed by Google across Douglas, Lancaster, and Sarpy counties. Two facilities are currently operating, one is under construction, and one is in the planning phase.

Is Google the only company with AI data centers in Nebraska?

Yes. Based on this site's tracking data, Google is the only company operating or proposing major AI data center campuses in Nebraska. Other major operators such as Microsoft, Meta, and Amazon Web Services do not have facilities tracked in the state on this site.

What is Google's Lincoln Phase 2 data center?

Google's Lincoln Phase 2 project, designated as the Google Nebraska Mega-Campus, is a proposed 2,700-megawatt hyperscale development in Lancaster County announced in March 2026. The facility would require more power than the city of Lincoln uses at peak summer demand. Google plans to supply the site through a privately built utility-scale natural gas plant built in partnership with Tenaska and Tallgrass Energy, with potential operation starting as early as 2029.

Are there AI data centers in Boone County, Nebraska?

No facilities in Boone County appear in this site's tracking data. Ban the Bots tracks Nebraska AI data centers exclusively in Douglas, Lancaster, and Sarpy counties. Any local permit inquiries or preliminary discussions in Boone County do not correspond to a tracked facility in this site's database.

How much power will Google's new Nebraska data center need?

Google's proposed Lincoln Phase 2 campus is designed for 2,700 megawatts of capacity. Because this exceeds the peak electricity usage of the entire city of Lincoln, the site cannot rely solely on the regional electric grid and would require a dedicated, privately built natural gas power plant.

Conclusion: Tracking Nebraska's AI Buildout

Nebraska's data center profile stands apart due to Google's total footprint across Douglas, Lancaster, and Sarpy counties, capped by a 2,700-megawatt mega-campus proposal that would reshape local natural gas power generation. Explore the interactive AI data center map to see coordinates and details for every facility, or examine how utility infrastructure shifts across the border in Ban the Bots' guide to AI data centers in Iowa.

Frequently asked questions

How many AI data centers are in Nebraska?
Ban the Bots tracks four major AI data center facilities in Nebraska as of 2026, all owned or developed by Google across Douglas, Lancaster, and Sarpy counties. Two facilities are currently operating, one is under construction, and one is in the planning phase.
Is Google the only company with AI data centers in Nebraska?
Yes. Based on this site's tracking data, Google is the only company operating or proposing major AI data center campuses in Nebraska. Other major operators such as Microsoft, Meta, and Amazon Web Services do not have facilities tracked in the state on this site.
What is Google's Lincoln Phase 2 data center?
Google's Lincoln Phase 2 project, designated as the Google Nebraska Mega-Campus, is a proposed 2,700-megawatt hyperscale development in Lancaster County announced in March 2026. The facility would require more power than the city of Lincoln uses at peak summer demand. Google plans to supply the site through a privately built utility-scale natural gas plant built in partnership with Tenaska and Tallgrass Energy, with potential operation starting as early as 2029.
Are there AI data centers in Boone County, Nebraska?
No facilities in Boone County appear in this site's tracking data. Ban the Bots tracks Nebraska AI data centers exclusively in Douglas, Lancaster, and Sarpy counties. Any local permit inquiries or preliminary discussions in Boone County do not correspond to a tracked facility in this site's database.
How much power will Google's new Nebraska data center need?
Google's proposed Lincoln Phase 2 campus is designed for 2,700 megawatts of capacity. Because this exceeds the peak electricity usage of the entire city of Lincoln, the site cannot rely solely on the regional electric grid and would require a dedicated, privately built natural gas power plant.

Latest related briefings