AI Data Centers in Wisconsin: Every Facility Tracked (2026)

Microsoft, Oracle, and Meta have built or are building four major AI data centers across Wisconsin, including the campus Microsoft calls the world's most powerful AI datacenter for training. See where, how big, and what it means for water and power.

Last updated July 27, 2026 1148-word guide Editor Ban the Bots

Wisconsin is home to one of the most powerful AI data center buildouts in the country, anchored by a Racine County campus dubbed "the world's most powerful AI datacenter for training." Ban the Bots' data center map tracks four major AI data center facilities across Wisconsin as of 2026 — a combined 5,320 megawatts of tracked capacity, more than Texas's tracked 4,500+ megawatts, though still behind Virginia's tracked 8,300+ megawatts, the largest concentration in the country.

Which AI companies are building data centers in Wisconsin?

Three companies operate the four major AI data center facilities tracked on this site in Wisconsin: Microsoft, which operates two separate campuses in Racine County; Oracle, building a Stargate data center in Ozaukee County in partnership with Vantage Data Centers as part of Oracle's $300 billion-plus partnership with OpenAI; and Meta, building a dry-cooled campus in Dodge County.

Why is Wisconsin attracting AI data centers?

Based on the facilities tracked here, a few factors stand out:

Water, power, and community concerns

Wisconsin's AI buildout has already drawn real local pushback — and it also includes a notable exception:

For the broader pattern of water and power trade-offs across every state, see Ban the Bots' AI data centers near you explainer and the AI water use calculator.

Wisconsin AI data center facilities, one by one

Facility details, coordinates, and sourcing are kept current on the interactive data center map.

FAQ: AI data centers in Wisconsin

How many AI data centers are in Wisconsin?

Ban the Bots tracks four major AI data center facilities in Wisconsin as of 2026, operated by Microsoft (two campuses), Oracle (with Vantage Data Centers), and Meta, with a combined tracked capacity of roughly 5,320 megawatts.

Where are Wisconsin's AI data centers located?

Racine County (Mount Pleasant) hosts two separate Microsoft campuses, including Project Fairwater. Ozaukee County (Port Washington) hosts Oracle's Stargate data center, with a further Microsoft campus planned for the same area. Dodge County (Beaver Dam) hosts Meta's AI data center.

What is Microsoft's Project Fairwater?

Project Fairwater is a Microsoft AI data center in Mount Pleasant, Racine County, that Microsoft has dubbed the world's most powerful AI datacenter for training. Its 315-acre campus houses hundreds of thousands of Nvidia GB200/GB300 GPUs across 1.2 million square feet, with Phase 1 (400 MW) operational in early 2026 and a total planned build-out of 3,300 MW by late 2027, representing a $7.3 billion investment.

Do Wisconsin's AI data centers use a lot of water?

It varies by facility. Microsoft's Wisconsin Data Center Campus in Mount Pleasant draws from Lake Michigan, which has drawn local concern over both water use and the loss of the farmland the campus was built on. Meta's Beaver Dam campus, by contrast, uses dry-cooling technology that eliminates operational water demand and includes a wetlands and prairie restoration program. Water sourcing for Microsoft's Project Fairwater and Oracle's Port Washington campus is not publicly specified in this site's tracking data.

Conclusion: tracking Wisconsin's AI buildout

Wisconsin's AI data center buildout is now large enough, and concentrated enough in Racine and Ozaukee counties, to rank among the most significant in the country — anchored by a facility Microsoft calls the most powerful AI datacenter for training ever built, alongside a genuine counterexample in Meta's dry-cooled, wetlands-restoring Beaver Dam campus. For the national picture, see the full AI data center map, and for the human and environmental impact this buildout can have on a community, see AI data centers near you: pros, cons and backlash.

Frequently asked questions

How many AI data centers are in Wisconsin?
Ban the Bots tracks four major AI data center facilities in Wisconsin as of 2026, operated by Microsoft (two campuses), Oracle (with Vantage Data Centers), and Meta, with a combined tracked capacity of roughly 5,320 megawatts.
Where are Wisconsin's AI data centers located?
Racine County (Mount Pleasant) hosts two separate Microsoft campuses, including Project Fairwater. Ozaukee County (Port Washington) hosts Oracle's Stargate data center, with a further Microsoft campus planned for the same area. Dodge County (Beaver Dam) hosts Meta's AI data center.
What is Microsoft's Project Fairwater?
Project Fairwater is a Microsoft AI data center in Mount Pleasant, Racine County, that Microsoft has dubbed the world's most powerful AI datacenter for training. Its 315-acre campus houses hundreds of thousands of Nvidia GB200/GB300 GPUs across 1.2 million square feet, with Phase 1 (400 MW) operational in early 2026 and a total planned build-out of 3,300 MW by late 2027, representing a $7.3 billion investment.
Do Wisconsin's AI data centers use a lot of water?
It varies by facility. Microsoft's Wisconsin Data Center Campus in Mount Pleasant draws from Lake Michigan, which has drawn local concern over both water use and the loss of the farmland the campus was built on. Meta's Beaver Dam campus, by contrast, uses dry-cooling technology that eliminates operational water demand and includes a wetlands and prairie restoration program. Water sourcing for Microsoft's Project Fairwater and Oracle's Port Washington campus is not publicly specified in this site's tracking data.